Been doing a little every day - but sometimes it's
very little.
Sheer clamps are on and end pours done (no holes yet). Need to do most of the interior before fitting the deck.
Decided on a circular hatch in the front bulkhead and have cut out the pieces to make it a 1/8th turn fit.
The tricky bit will be making it fit so it seals.
Also started making adjustable footpegs. Not sure if they will be strong enough but it's worth a try.
Found that the long backing slat was too flexible so glued another layer on today.
Be careful in warm weather folks - had a mix melt the mixing cup today. It was only a bit over an ounce but I divided it in 2 to help keep it cool and prolong the working time. The half in use started to feel quite hot, so I looked at the other and it was smoking. Dropped it on the concrete floor and broke it up a bit. The table it was sitting on had resin, hardener and acetone on it too and if left much longer it could have been a drama.
Just managed to get the footpeg slats laminated before the mix was too stiff to use.